University of Leoben - Chair of System Analysis and Environmental Engineering
Other Projects
Other projects in relation to project IRON CURTAIN
Groundwater potential in crystalline of the Bohemian
massif in Upper Austria (1998)
Hydrogeological analysis (data base, statistics, model)
of sand quarrying in the Halámky area of Southern Bohemia (1996)
link to the website
Optimization of groundwater protection measures in
Vienna-Lobau by means of numerical model and annual monitoring
of effects (1993-2001) link to the website
Hydrological analysis and numerical groundwater
modeling for water management concept in the Gmünd ware on
Austrian-Czech border (1993) link to the website
Risk analysis of soil contamination by heavy metals
at industrial sites Gailitz and Saag (1993 - 1995)
Computer-aided geological mapping in Styria in the
scale 1:50.000 (sheets Grübming, Knittelfeld, Hartberg, Weiz,
Muhr, Voitsberg, Leibnitz), manuscript data base (1989 - 1992)
Information system of company locations, supply of
sites, infrastructure and technology profiles with GIS
background for EA Styria (1992)
Information System for the OMV (oil and gas company)
operations in Austria focused on the environmental site
characterization (1996)
Integration prototype to solve environmental and land use conflicts:
Lower Austria province (area of approx. 123 km2 - Amstetten, Winklarn, Ybbsfeld...)
The GIS plays the role of a pre, post processor and measurement tool for the central numerical
decision model of scoring- and market functions for assessing
concurrent land use strategies (1991-1996)
Oc3C - A case study was developed to test the decision
support model based on indicator scores using the GIS as a
preprocessor. For the area of investigation, the "Mattigtal",
extending over 300 km2 in the south-western part of
Upper Austria province.
Using the GIS as a preprocessor, 179 individual areas have
been identified for assessment. As a main step in preparing
and supporting decision making, the used scoring model was
adapted to the requirements of the areas problem, using 5
different scenarios. This result in priority ranking of
areas of the maximal socio-economical benefit for each
possible land use alternative. Results were visualized by
using again GIS again.
Other EC Projects:
SESCO
Development of sustainable energy systems for
communities adapted to different economic and
environmental conditions in two European model
regions. (2002-2006)
Project Reference Number: NNE5-2001-310
Role in project: Co-ordinator
Website: http://www.sesco-cluster.net/
GP.COM
Green Power Community with Demonstrations in Two
European Countries (2003 - 2005)
Role in Project: Contractor
Project Number: NNE5-2001-00509
Website and more details: http://www.gp-com.at
OMENTIN
Ore Mining and Environmental Technology information
Network
Role in project: Contractor
Project Reference Number: HRP-CT-2001-00002
Website: http://www.omentin.org/
TRABOREMA
Concepts for integrated transboundary water
management and sustainable socio-economic
development in the cross border region of Albania,
Former Yugoslav Republic of Macedonia (FYROM) and
Greece. (2004-2006)
Role in Project: Co-ordinator
Project Number: INCO-CT-2004-509177
|